15
A.
B.
Connect a T-Joiner to both ends of an Extra Large Top Rail.
Repeat for the 1 remaining Extra Large Top Rail.
CONTINUE TO STEP 16 FOR EXTRA LARGE
Attach the completed Extra Large Top Rails to
the top of the Upper Frame Tubes.
Slide both Lower Frame Tube pairs into the
bottom of the Upper Frame Tubes to complete
the climbing frame section.
11
STEP
EXTRA LARGE
12
STEP
EXTRA LARGE
13
STEP
EXTRA LARGE