24
Operation EHB 11
7 Operation
7.1 Prior to starting the machine
After unpacking, the machine is ready for operation.
Plug
The machine comes with a country-specific plug as a standard equipment.
Checking the machine
f Check the machine and all components for damages.
Checking the mains
f Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter Technical Data).
f Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety information.