EasyManua.ls Logo

Walkera Dragonfly 4 - Page 34

Walkera Dragonfly 4
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reinstall Jesus bolt, apply Loctite to tip of screw or hex nut and tighten.
Level
swashplate, both rods made the same length before install, “L” control arms at 90°, and flybar paddles
also level. It'll fly smoothly. Now with the swashplate level, blade pitch at about 3-4°, the pitch control
mixing arms (35-028) should be level also. Move the throttle to where the pitch block on the mainshaft
is centered in the middle of the up/down channel in the shaft. The two lower arms will be level, while
the 2 upper arms on the flybar will be either level or slightly downward...depending on how the linkage
rods were Z-bended. With the swashplate perfectly level, just make sure you have