EasyManua.ls Logo

Wallenstein WX370 - Be Prepared

Wallenstein WX370
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Safety
WX370
3-point Hitch Wood Splitter
Safety
10
2.8 Be Prepared
1. Determine where the split wood is going to be piled
ahead of time. Make sure it does not interfere with
safe loading of wood into the splitter.
2. Precut logs so wood is ready to load into the
splitter. Do not run a chain saw and the splitter at
the same time.
3. Determine a safe work area location:
Area must be clear of stones, branches or
hidden obstacles that might cause a tripping,
hooking or snagging hazard.
Ground should be rm and level.
4. Operate only in daylight or good articial light.
5. Make sure machine is properly adjusted and in
good operating condition.
6. Perform the Pre-operation Checklist before
starting work (see Pre-operation Checklist on page
23).
7. Do not operate on hillsides or when working area is
cluttered, wet, muddy or icy to prevent slipping and
tripping. Operate only on level ground.
8. Position machine so prevailing winds blow engine
exhaust fumes away from the operator.
9. Do not operate machine inside a closed building to
prevent asphyxiation from engine exhaust.
10. Stop engine when leaving the machine
unattended.