EasyManua.ls Logo

WAMGROUP SBB-HFF - 5 Installation and Fixing; Recommendations for Installation; Positioning

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
23
SBB-HFF
5.1 Recommendations for installation
Danger - Warning
The installation operations have to be carried out by a technician specialized in such activities.
Provide appropriate safety measures and use suitable equipment to prevent risk of work accident to
persons involved in the operations and to those nearby.
Harness and handle the sections of the equipment concerned as described and shown in the “Unload-
ing and lifting method” paragraph.
The FIBC UNLOADER must be installed with su󰀩cient clearance around it to allow for normal assembly/disas-
sembly, cleaning and maintenance operations.
In this manual, from here onwards “setting the machine in safety conditions” will indicate the following
operations:
- Make sure the machine is disconnected from all electric power supply sources.
- Make sure the machine is completely stopped
- Provide su󰀩cient lighting around the machine operating area (the operators may be provided with electric
lamps if necessary).
- Wait for the powder mass inside to settle down completely, and then stop the machine.
Before carrying out any operation on the machine (maintenance or cleaning), the operators must use suitable
personal protection equipment:
- antistatic safety footwear (certied)
- antistatic protective clothing (certied)
- helmet
- antistatic, cut-proof gloves
- safety masks
In addition to these, use the safety devices specied in the safety chart of the product handled.
5.2 Positioning
To remove the packing, use a cutter or a pair of scissors to cut the heat-shrink nylon covering.
Take special care to avoid damaging parts of the machine and/or scratch the paint with the blade.
It is recommended to use a hammer to remove the packaging of the crate that protects the machine.
The FIBCs require certain operations for completing assembly before starting operation, in particular: