EasyManua.ls Logo

Watts Benchmark Aerco OMM-0122 - 2.5.2 BMK 1500 - 3000 Lifting Provisions

Watts Benchmark Aerco OMM-0122
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Benchmark 750-3000 Boiler Installation & Startup Manual
SECTION 2 INSTALLATION
OMM-0121_D GF-205 5/9/2019 Technical Support (800) 526-0288 Mon-Fri, 8 am - 5 pm EST Page 20 of 122
2.5.2 BMK 1500 – 3000 Lifting Provisions
Three lifting lugs are provided at the top of the primary heat exchanger as shown in Figure 2-3b.
Remove the front top panel from the unit to provide access to the lifting lugs. Remove the four
(4) lag screws securing the unit to the shipping skid. Lift the unit off the shipping skid and
position it on the 4 inch to 8 inch (10.2 cm to 20.3 cm) housekeeping concrete pad (required)
in the desired location.
Figure 2-3b: Boiler Lifting ProvisionsBMK 1500/2000 Shown
LIFTING LUGS (3 POSITIONS)
YELLOW ARROWS
2” NATURAL
GAS OR 1”
PROPANE GAS
INLET

Table of Contents

Related product manuals