EasyManua.ls Logo

Weber mt VPR 450 - Storage; On-Site Storage; Extended Period Storage

Weber mt VPR 450
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Storage for an extended period If the machine will not be used for a period longer than one
month, the following measures must be taken:
Clean the entire machine thoroughly.
Check the entire machine for leaks. Correct any detected
defects.
Empty fuel and ll the tank with clean fuel.
Check and, if necessary, correct the engine oil level.
Check and clean the air lter. Replace if damaged.
Lightly oil all bare parts and levers.
If the machine is to be stored for longer than six
months, contact the Weber MT’s service organization
to discuss additional measures.
7. Storage
Storage at the construction site If stored at the construction site, e.g. over night, the machine
must be secured against theft and unauthorized use.
Parked machines presenting an obstacle must be secured in
accordance with statutory regulations, particularly in the area
of public tra󰀩c surfaces.

Related product manuals