WECO 5K3-XP RACK LV-EMEA
10
Version 11/11/2021
General Preparation
Before Installation:
Ensure that all the modules are turned OFF.
The battery installation location should be at least 20m away from sources of heat, protected from any source of sparks or
other sources of extreme temperature. Battery connecting cables shall be as short as possible to prevent excessive voltage
drops.
Batteries with different capacities, different type/model or designs or from different manufacturers shall not be connected
together.
1.
Before connecting the battery, the battery positive and negative poles shall be carefully checked
to ensure correct installation.
2.
The installation of the cabinet or structure must be located on a flat level surface, in a dry, clean,
and protected room, away from water and humidity, unless the cabinet has an IP rate above IP
54
Before starting any operation on the battery, make sure to position the cabinet/rack structure its
final position and structurally fix all the modules that make up the system.
The installer who intends to install the WeCo 5K3-XP Rack Battery Module in the LV configuration
should read this entire manual including the LV configuration information defined in Section 2.