EasyManua.ls Logo

Wellsys WS15000 - Page 16

Wellsys WS15000
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
1. Drain the Unit
2. The ice bin and water reservoir drain ports are located behind the drip tray, while
the hot tank drain is behind the front panel
3. Power down the unit and Insert supplied tube into desired drain port to drain unit
PREVENTATIVE MAINTENANCE
Hot DrainReservoir DrainBin Drain