EasyManua.ls Logo

Westfield MKX130-94 User Manual

Default Icon
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Part Number: 30797 R5
Revised: 1/6/2017
Read this manual before using product. Failure
to follow instructions and safety precautions can
result in serious injury, death, or property
damage. Keep manual for future reference.
GRAIN AUGERS
MKX130-84/94/114
ASSEMBLY & OPERATION
ORIGINAL INSTRUCTIONS

Table of Contents

Questions and Answers:

Westfield MKX130-94 Specifications

General IconGeneral
BrandWestfield
ModelMKX130-94
CategoryFarm Equipment
LanguageEnglish

Summary

1. Introduction

1.1.1. Auger Power Source

Explains standard and optional PTO drive systems for powering the auger.

2. Safety

2.1. General Safety Information

Defines safety alert symbols, signal words, and general safety principles.

2.2. Assembly Safety

Provides essential safety guidelines and precautions to be followed during equipment assembly.

2.3. Operation Safety

Outlines critical safety procedures for operating the auger to prevent injury or damage.

2.4. PTO Safety

Details safety precautions related to the PTO driveline to prevent accidents.

2.5. Hydraulic Safety

Covers safety measures for the hydraulic system, including leak prevention and safe handling.

2.6. Transport & Placement Safety

Provides safety guidelines for transporting and positioning the auger to prevent accidents.

2.7. Maintenance Safety

Details safety procedures to follow when performing maintenance or servicing the auger.

3. Assembly

3.2. Assemble the Auger Tube

Covers the process of assembling the main auger tube sections, including identification and arrangement.

3.7. Connect the Auger Tube to the Frame

Instructions for connecting the assembled auger tube to the auger frame.

3.10. Connect the PTO Driveline

Instructions for securely connecting the PTO driveline to the auger for power transmission.

3.15. Auger-to-Tractor Hookup

Explains proper procedures and measurements for hitching the auger to a tractor.

4. Transport

4.1. Transport Procedure

Provides a step-by-step guide for safely preparing and transporting the auger.

5. Placement

5.1. Placement Procedure

Details the steps for safely positioning the auger at the operating location.

6. Operation

6.2. Pre-Operation

Lists essential checks and procedures to perform before operating the auger.

6.2.1. Checklist

A comprehensive checklist of all items to inspect and verify before starting the auger.

6.2.2. PTO Drive

Details on ensuring the PTO drive system is correctly set up and safe for operation.

6.2.3. Hydraulics

Pre-operation checks for the hydraulic system, including connections and fluid.

6.3. Operating Procedures

Step-by-step instructions for the normal and emergency operation of the auger.

6.3.1. Initial Start-Up

Guidance for the first-time startup of the auger, including break-in procedures.

6.3.2. Normal Start

Procedures for safely starting the auger for regular grain transfer operations.

6.3.4. Emergency Stop / Full-Tube Restart

Instructions for emergency shutdown and restarting the auger if it becomes filled with material.

7. Maintenance and Storage

7.3. Maintenance Procedures

Step-by-step instructions for performing various maintenance tasks on the auger.

Related product manuals