Winkhaus AV2 / E Manual 5
General
information
Fabrication
Procedures
Installation
Procedures
Operating
Instructions
Routine
Maintenance
Troubleshooting
Guides
Sash
Routing Details
Frame
Routing Details
1
2
3
4
5
6
7
V. Stand door set vertical and check adjustments and operation.
VI. If machining and keep location is correct and therefore in the optimum position, keep
adjustments should only be necessary on site to assist/fine tune door set installation.
1.3 Fabrication final checks and adjustments
Such checks can only be done with the door vertical, as the lock is reliant on the free movement
of the gravity falling drive strip.
The latch keep, should be adjusted so that when the sash is firmly closed against the weather
seal and latched, the hooks fall and throw fully automatically.
Adjust the keeps to ensure the hooks are fully thrown.