Do you have a question about the Winkhaus AV2 E and is the answer not in the manual?
Detailed steps for preparing the sash and frame components for AV2 locking system installation, including marking and routing.
Procedure for installing the lock into the sash and fitting the door leaf into the outer frame, including keep placement.
Guidance on performing final checks and making necessary adjustments during the fabrication process for optimal lock function.
Steps for setting up the installation, including checking plumb, parallel, and sash-to-frame trueness for correct operation.
Specific instructions on glazing techniques such as toeing and heeling, and packing opposite hooks for security.
Procedures for setting up the door, verifying centre lines, and ensuring correct air gaps between sash and frame for optimal performance.
Final checks and adjustments after installation to ensure hooks throw fully and the sash operates correctly without interference.
Common symptoms and faults for the AV2 manual locking system, with recommended remedial actions for each issue.
Troubleshooting guide for the AV2 E electromechanical system, covering motor operation, electrical faults, and wiring issues.
Detailed routing diagrams and dimensions for the F24 AV2 full-length (3-piece) keeps in the door frame.
Technical drawings showing routing specifications for F24 AV2 single pocket keeps, including various end types.
Routing dimensions for F24 AV2 one-piece full length rounded end keeps, illustrating precise placement and cutouts.
Detailed routing diagrams for the sash, specific to 20mm face plates for AV2 and AV2 E locking systems.
Routing specifications for AV2 and AV2 E systems with 20mm rounded end face plates, detailing sash cutouts.
Technical routing diagrams for AV2 and AV2 E systems using 16mm face plates, covering full-length sash preparations.
| Brand | Winkhaus |
|---|---|
| Model | AV2 E |
| Category | Door Opening System |
| Language | English |