EasyManua.ls Logo

Wolf KG - Roof Installation

Wolf KG
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
3062049_201610
KG Top
TheweatherproofedKGWversionalwayshasafullyinstalledroofmadeofzinc-plated
sheet steel.
Splitunitsaredeliveredtositewiththeroofsectionsprettedtotheindividualsections.
If the interface at which two units are split does not line up with the pitch of the roof
sections, the requisite single roof section is supplied loose and must be installed on site
once the air-handling unit has been assembled and installed. The requisite fasteners
and sealing materials are supplied with the appliance.
The lifting eyes can remain in the unit as sealed in the factory.
Roof
Use a plastic-headed mallet to tap the cover strip into place.
Note
Pack space of sealing strip with sealing compound
Installationinstructions
The roofs of the weatherproof appliances can be stepped on for assembly. Attention
must be paid here to the area distribution of the load (boards).
No static point loads may be applied to the roofs.

Related product manuals