EasyManua.ls Logo

Worcester danesmoor 12/14 User Manual

Worcester danesmoor 12/14
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DANESMOOR
12/14, 15/19, 20/25, 26/32, 32/50, 50/70
CONVENTIONAL FLUE AND ROOM SEALED BF
FLOOR STANDING OIL-FIRED PRESSURE JET APPLIANCES
INSTALLATION AND
SERVICING INSTRUCTIONS
BOILER OUTPUT
Hot Water and Central Heating
12/14 MINIMUM 12 kW (41,000 Btu/h)
MAXIMUM 14 kW (48,000 Btu/h)
15/19 MINIMUM 15 kW (51,000 Btu/h)
MAXIMUM 19 kW (65,000 Btu/h)
20/25 MINIMUM 20 kW (68,000 Btu/h)
MAXIMUM 25 kW (85,000 Btu/h)
26/32 MINIMUM 26 kW (89,000 Btu/h)
MAXIMUM 32 kW (109,000 Btu/h)
32/50 MINIMUM 32 kW (109,000 Btu/h)
MAXIMUM 50 kW (170,000 Btu/h)
50/70 MINIMUM 50 kW (170,000 Btu/h)
MAXIMUM 70 kW (239,000 Btu/h)
THESE INSTRUCTIONS APPLY TO UK MODELS ONLY
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE APPLIANCE

Other manuals for Worcester danesmoor 12/14

Question and Answer IconNeed help?

Do you have a question about the Worcester danesmoor 12/14 and is the answer not in the manual?

Worcester danesmoor 12/14 Specifications

General IconGeneral
MountingFloor Standing
Fuel TypeOil
Warranty2 Years
TypeConventional
Dimensions600mm

Summary

4. Siting the Appliance

Clearances for Installation and Servicing

Specifies required clearances around the appliance for safe installation and maintenance access.

6. Air Supply

7. Flue System Installation

Conventional Flue (CF) Requirements

Covers flue pipe sizing, installation, and draught requirements for conventional flue systems.

Flue Terminal Siting Guidelines

Provides crucial guidance on safe and effective placement of flue terminals.

8. Oil Supply System

10. Electrical Systems and Controls

System Wiring and Mains Connections

Covers electrical supply compliance, mains wiring, and connection to the appliance.

11. Installation Procedures

Flue and Oil Supply Installation

Guides through the installation of the flue system and the oil supply pipework.

12. Appliance Commissioning

Initial Checks and System Preparation

Covers pre-commissioning checks, electrical supply, and heating system preparation.

Burner Inspection and Installation

Guides on checking, replacing, and installing the burner correctly.

Burner Operation and Fine-Tuning

Details procedures for bleeding the burner, adjusting settings, and ensuring stable operation.

14. Routine Cleaning and Inspection

Related product manuals