EasyManua.ls Logo

Worcester DANESMOOR User Manual

Worcester DANESMOOR
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DANESMOOR
SYSTEM BOILER
CONVENTIONAL FLUE AND ROOM SEALED BF
FLOOR STANDING OIL-FIRED PRESSURE JET APPLIANCES
INSTALLATION AND
SERVICING INSTRUCTIONS
BOILER OUTPUT
Hot Water and Central Heating
12/14 MINIMUM 12 kW (41,000 Btu/h)
MAXIMUM 14 kW (48,000 Btu/h)
15/19 MINIMUM 15 kW (51,000 Btu/h)
MAXIMUM 19 kW (65,000 Btu/h)
20/25 MINIMUM 20 kW (68,000 Btu/h)
MAXIMUM 25 kW (85,000 Btu/h)
THESE INSTRUCTIONS APPLY TO UK MODELS ONLY
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE APPLIANCE
Question and Answer IconNeed help?

Do you have a question about the Worcester DANESMOOR and is the answer not in the manual?

Worcester DANESMOOR Specifications

General IconGeneral
Fuel TypeOil
Installation TypeFloor Standing
FuelOil
ModelDANESMOOR
Dimensions600mm

Summary

Installation Regulations

General Information

Technical Data

Siting the Appliance

Removal of the Cabinet

Air Supply

Open Flue Model Air Supply

Covers air supply requirements for conventional and low-level flue models.

Room Sealed Flue Model Air Supply

Covers air supply requirements for room sealed balanced flue models.

Flue System

Conventional Flue Installation

Details specifications and installation for conventional flues.

Low Level Discharge Flue

Information on converting to low-level discharge flue arrangements.

Room Sealed Balanced Flue System

Installation of room sealed balanced flue systems.

Flue Terminal Siting

Guidelines for positioning flue terminals to ensure safe dispersal.

Oil Supply

Oil Supply System Types

Details on single pipe, double pipe, and de-aerator systems.

Oil Supply Pipework

Guidelines for selecting pipe diameter and fitting components.

Heating and Hot Water System

System Pipework Requirements

Details on copper and plastic pipework for sealed and open vent systems.

Sealed Primary System Compliance

Compliance requirements for sealed primary systems.

Electrical Installation

Mains Supply Wiring

Instructions for connecting the 230V AC mains supply to the appliance.

Programmer Connection

Information on fitting and connecting internal or external programmers.

Installation Procedures

Conventional Flue Appliance Installation

Specific installation steps for conventional flue models.

Room Sealed Flue Appliance Installation

Specific installation steps for room sealed balanced flue models.

Heating System Installation

Procedure for plumbing the boiler and filling the heating system.

Oil Supply Installation

Steps for connecting the oil supply pipe and hoses.

Commissioning the Appliance

Prepare Heating System for Commissioning

Steps for flushing, filling, and setting pressure for the heating system.

Burner Inspection and Checks

Inspection of burner components and settings before re-assembly.

Installation Checks

Final checks on wiring, insulation, baffles, and connections.

Bleed the Burner System

Procedures for bleeding air from single pipe and double pipe systems.

Instructions to the User

Routine Cleaning and Inspection

Pre-Service Check Procedure

Steps for initial checks before commencing servicing.

Burner Cleaning Process

Detailed procedure for cleaning the fan impeller and burner components.

Fault Finding

Ignition Failure Troubleshooting

Troubleshooting steps for when the burner fails to ignite.

Burner Fails to Start Diagnosis

Diagnosing why the boiler does not respond to a call for heat.

Faulty Boiler Operation Issues

Identifying causes for noisy operation, boiling, or intermittent flame.

High Smoke Number Causes

Troubleshooting excessive smoke production during operation.

Oil Smells and Leaks

Addressing oil smells in the boiler room or from oil leaks.

Pulsation on Start Issues

Steps to resolve pulsation issues during burner start-up.

Short Parts List

Related product manuals