EasyManua.ls Logo

Worcester GREENSTAR 37CDi GC User Manual

Worcester GREENSTAR 37CDi GC
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
RCDi
D CONDENSING COMBINATION BOILER
AND
MAINS
FED
DOMESTIC
HOT
WATER
THE APPLIANCE IS FOR USE WITH
NATURAL GAS OR L.P.G. (Cat
II
2H3PTYPE C13 & C33)
NATURAL GAS:
WORCESTER GREENSTAR 25CDi
GC
NUMBER 47·311-92
WORCESTER GREENSTAR 30CDi
GC
NUMBER 47-311-93
WORCESTER GREENSTAR 37CDi
GC
NUMBER
47-406-08
WORCESTER GREENSTAR 42CDi
GC
NUMBER
47-406-10
LlOUID PETROLEUM GAS:
WORCESTER GREENSTAR 25CDi
GC
NUMBER 47-311-96
WORCESTER GREENSTAR 30CDi
GC
NUMBER
47-311-97
WORCESTER GREENSTAR 37CDi
GC
NUMBER 47-406- 09
WORCESTER GREENSTAR 42CDi
GC
NUMBER
47-406-11
INSTRUCTION MANUAL
INSTALLATION, COMMISSIONING
&SERVICING
Question and Answer IconNeed help?

Do you have a question about the Worcester GREENSTAR 37CDi GC and is the answer not in the manual?

Worcester GREENSTAR 37CDi GC Specifications

General IconGeneral
BrandWorcester
ModelGREENSTAR 37CDi GC
CategoryBoiler
LanguageEnglish

Summary

SAFETY & REGULATIONS

Safety Precautions and Warnings

Outlines essential safety measures for gas, materials, and appliance handling.

Installation Regulations and Standards

Details legal requirements, British Standards, and specific installation rules.

TECHNICAL DATA

Comprehensive Technical Data Table

Detailed performance and operational data for different models.

PRE-INSTALLATION: MAINS SUPPLIES

Electrical, Gas, and Water Supply Requirements

Details requirements for electrical, gas, and water connections.

BOILER LOCATION & CLEARANCES

Location, Clearances, and Compartment Requirements

Specifies required clearances for installation and servicing.

FLUE TERMINAL POSITIONS

Flue Terminal Positioning Guidelines

Specifies minimum distances and positions for flue terminals.

INSTALLATION: WALL MOUNTING AND FLUE

Wall Mounting Plate and Flue Opening Installation

Instructions for fitting the wall mounting plate and preparing the flue opening.

INSTALLATION: CHARGING LINK (FILLING LOOP)

System Filling Procedure Using Charging Link

Step-by-step guide for filling the system using the charging link.

INSTALLATION: FITTING THE APPLIANCE

Boiler Connections and Mounting

Guide to making all necessary water, gas, and electrical connections.

INSTALLATION: FLUE INSTALLATION

Horizontal Flue Measurement and Installation

Instructions for measuring and installing horizontal flues correctly.

INSTALLATION: ELECTRICAL CONNECTIONS

Accessing and Making Electrical Connections

Steps for accessing the control panel and making electrical connections.

COMMISSIONING: PRE-COMMISSIONING CHECKS

Performing Pre-Commissioning Checks

Checklist of essential checks before starting the commissioning process.

COMMISSIONING: FILLING THE SYSTEM

System Filling and Gas Supply Check

Procedure for filling the system with water and checking gas supply.

COMMISSIONING: STARTING THE APPLIANCE

Appliance On/Off Procedure and Initial Start-up

Steps for safely switching on the appliance and its initial operation.

COMMISSIONING: SETTING PARAMETERS

Gas Inlet Pressure and DHW Settings

Procedures for checking gas pressure and setting DHW temperatures.

SERVICING: INSPECTION AND SERVICE

General Inspection Procedures

Routine checks for terminal, clearances, and system connections.

REPLACEMENT OF PARTS (continued)

Heat Exchanger Replacement

Detailed steps for removing and replacing the heat exchanger.

SETTING THE GAS/AIR RATIO

Setting the CO2 Level and Gas Pressure

Guide to adjusting CO2 levels and checking gas pressure.

L.P.G. CONVERSION

FAULT FINDING

Fault Finding Codes and Preliminary Checks

Table of fault codes, descriptions, and initial checks.

Related product manuals