EasyManua.ls Logo

Worcester GREENSTAR 30CDi

Worcester GREENSTAR 30CDi
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
UK/IE
INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS
WALL HUNG RSF GAS FIRED CONDENSING REGULAR BOILER
GREENSTAR CDi CLASSIC REGULAR
FOR OPEN VENTED AND SEALED CENTRAL HEATING SYSTEMS AND INDIRECT DOMESTIC HOT WATER
6 720 806 548 (2013/02)
THE APPLIANCE IS FOR USE WITH NATURAL GAS OR L.P.G.
(Cat II 2H3P TYPE C13 & C33)
NATURAL GAS:
30CDi Regular GC Number 41-311-71
40CDi Regular GC Number 41-311-72
LIQUID PETROLEUM GAS:
30CDi Regular GC Number 41-311-73
40CDi Regular GC Number 41-311-74

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Worcester GREENSTAR 30CDi and is the answer not in the manual?

Worcester GREENSTAR 30CDi Specifications

General IconGeneral
ModelGREENSTAR 30CDi
CategoryBoiler
TypeCombi
Output30 kW
Flow Rate12.3 l/min
Hot Water Output30 kW
Fuel TypeNatural Gas
Dimensions760mm x 440mm x 360mm
Central Heating Output24 kW
Central Heating Flow Temperature Range30°C to 80°C

Summary

Key to Symbols and Safety Precautions

Safety Precautions

Provides crucial safety advice for gas leaks and boiler operation.

Appliance Information

Technical Data

Detailed specifications including gas, flue, electrical, and general data.

Layout & Components

Identifies and illustrates the boiler's internal components and controls.

Pre-Installation

Cleaning Primary Systems

Instructions for flushing and preparing the heating system before installation.

Mains Supply

Details electrical and gas supply requirements for installation.

Water Systems & Pipe Work

Guidelines for plastic pipework, connections, and sealed primary systems.

Condensate Pipe Work

Methods for internal condensate drainage to prevent freezing.

External Connections

Guidance on external condensate disposal, including rainwater pipes.

Boiler Location & Clearances

Specifies minimum clearances and location requirements for the boiler.

Flue Options

Overview of various horizontal and vertical flue systems and lengths.

Flue Terminal Positions

Minimum clearance requirements for flue terminal installations.

Plume Management Terminal Positions

Guidance on positioning terminals for plume management.

Installation

Wall Mounting Plate Flue Opening

Steps for fixing the wall mounting plate and creating the flue opening.

Commissioning

Checking Gas Inlet Pressure

Procedure to measure and verify gas inlet pressure.

Checking the Gas Rate

How to measure the gas rate for correct operation.

Servicing and Spares

Setting the AirGas Ratio

Detailed procedure for setting the air/gas ratio and CO2 levels.

Fault Finding & Diagnosis

Fault Finding

General fault finding guidance and a table of display codes and remedies.

Related product manuals