INTRODUCTION
This Flat Rate Manual is designed to be used as a guide for labor cost estimates of repair work.
1. What do the Flat Rate times mean?
ĺ Each description has a table listing showing the flat rate times for all applicable models. The
flat rate times are given in multiples of 1 /10 hour. Example:
ĺ The flat rate manual times have been designed to generally include all associated work.
2. How are the Flat Rate times determined?
Flat rate times are determined with the following conditions as a standard:
ĺ The common tools, special tools and all other equipment needed for repairs are on hand and
so placed as to be readily available for use. The times are not based on the use of any air tools.
ĺ The flat rate times have been developed, over time, from an average of work performed by
skilled mechanics.
3. Calculating the flat rate time when more than two kinds of work are performed at a
time on the same mower.
ĺ If the jobs are independent of one another, just add the times together.
ĺ If the jobs are related to one another or overlap, take either the longest time or the time for
the part which has been removed or replaced last.
.1 = 6 minutes
.2 = 12 minutes
.3 = 18 minutes
.4 = 24 minutes
.5 = 30 minutes
.6 = 36 minutes
.7 = 42 minutes
.8 = 48 minutes
.9 = 54 minutes
1 = 60 minutes
1.2 = 66 minutes
22