EasyManua.ls Logo

XLT Systems SC60 - Connecting to Power Supply

Default Icon
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
CAUTION:
It is installer’s responsibility to make sure that the ceiling structure can
support at least FOUR times the total weight of the lift and the projector.
Reinforce the structure as required before installing the lift.
1) The scissor lift should be supported by four M12 or 1/2 threaded mounting
rods spaced at800 mm wide x 460 mmdepth.The length of the rods may vary
depend on the height of the ceiling.
2) No mounting material is provided. Please use suitable anchors and fasteners
base on the ceiling type.
3) The threaded rods must be supported by a rigid structure and should not extend
more than 2' (600mm). If the rods need to extend more than 2', please use the
cross bracing to enhance the stability.
4) The threaded rods must pass through the mounting holes and secure by nuts
above and below.
5) Use the threaded locking compound angle nuts to prevent swinging.
6) Adjust the threaded rods length to get the proper height (the lower ceiling cover
should be same level with the false ceiling).
7) Check that the lift is leveled from front-to-back and side-to-side.
4. Connecting to Power Supply
CAUTION:
Please ensure that the operating voltage of the motor is related to the
standard of the local power supply. The motor can be damaged due to
incorrect voltage supply.
Please do not replace power supply cable of the motor. Please call local dealer
should you have any problem with the motor.
Please refer diagram below to connect to power supply.