EasyManua.ls Logo

Xtralis VESDA E-Series - 4) System tests

Xtralis VESDA E-Series
367 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4) System tests
Relay Test (Integration)
Verifies relay function, wiring, and FACP’s reaction to inputs
Validates the connection between detector and FACP or other systems
Initiates in VSC from the device menu
Pipe Integrity (Smoke Test):
Verifies transport time from the farthest hole or a maintenance test point and
compares with the original and previously recorded results to identify
deviations
Performance Test:
Measuring the performance of the system based on the given design
arrangement and application parameters run through ASPIRE (ceiling height,
classification, air circulation, etc.)
4) System tests
Performance Test Types:
Smoke Pellet Performance Test
Paper Burn Performance Test
Overheated PVC/LSF Wire Performance Tests
Overheated Resistor Performance Tests
Polyurethane Mat Performance Test
Aerosol smoke test
The performance tests conducted during commissioning depend on the
classification of the ASD system, local code, or AHJ preference

Table of Contents

Related product manuals