EasyManua.ls Logo

Yale PCHBL630SS

Yale PCHBL630SS
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Installation
Prepare location
It is recommended that the vent system be installed before
hood is installed.
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for exhaust vent.
Check your ceiling height and the hood height maximum before
you select your hood.
1 Disconnect power.
2 Determine which venting method to use: roof, wall, or
nonvented.
3 Selectaatsurfaceforassemblingtherangehood. Place
covering over that surface.
WARNING
TOREDUCETHERISKOFFIRE,ELECTRICSHOCK,OR
INJURYTOPERSONS,OBSERVETHEFOLLOWING.
4 Using 2 or more people, lift range hood onto covered
surface.
Mounting the duct cover bracket
1 Determine and mark the centerline on the wall where the
canopy hood will be installed. Disconnect power.
2 Select a mounting height from the Installation Heights chart.
Mark a reference line on the wall.
3 Tape template in place, aligning the template centerline
and bottom of template with hood bottom line and with the
centerline marked on the wall.
A
C
B
A.Centerline
B. Fastener locations
C.Mountingheightreference(hoodbottomline)
4 Mark centers of the fastener locations through the
template to the wall.
IMPORTANT:Allscrewsmustbeinstalledintowood. Ifthere
is no wood to screw into, additional wall framing supports may
be required.
5 Remove the template.
6 Drill
3
16
”(4.8mm)pilotholesatalllocationswherescrewsare
being installed into wood.
7 Install the 2 - 5 x 45 mm mounting screws. Leave a
1
4
”
(6.4mm)gapbetweenthewallandthebackofthescrewhead
to slide range hood into place.
1
4
(6.4 mm)
Vent cover bracket installation
1 Attachventcoverbrackettowallushtotheceilingusing
2 - 5 x 45 mm screws.
A
C
D
B
A.8x40mmanchors
B. Centerline on wall
C.Ventcoversupportbracket
D. 5 x 45 mm screws
Complete preparation
1 Determine and make all necessary cuts in the wall for the
vent system. Install the vent system before installing the
hood.See“VentingRequirements”section.
2 Determine the required height for the home power supply
cableanddrilla1¼”(3.2cm)holeatthislocation.
3 Run the home power supply cable according to the
NationalElectricalCodeorCSAStandardsandlocalcodes
andordinances.Theremustbeenough½”conduitandwires
fromthefuseddisconnect(orcircuitbreaker)boxtomakethe
connection in the hood’s electrical terminal box.
4 NOTE: Do not reconnect power until installation is complete.
Use caulk to seal all openings.

Related product manuals