EasyManua.ls Logo

YARD Commander 125LB - Page 12

YARD Commander 125LB
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 12 -
STEP 5: Connecting the Solid Linkage
1. Align the Linkage Bar on the right side of the Handle Assembly as shown in the diagram with the
90-degree end at the bottom near the hopper.
2. Insert the bottom end of the Linkage Bar into the metal hole at the base of the Hopper.
3. Put one flat washer Ø8 on the other side of Linkage Bar and tighten with one Lock Nut M8.
4. Insert the other end into the control lever bracket as shown in the diagram.
5. Put one flat washer Ø8 on the other side of Linkage Bar and tighten with one Lock Nut M8.
6. Put the hopper screen into the hopper and install rain cover.

Related product manuals