EasyManua.ls Logo

Yardistry YM12810X - Frame Assembly and Anchoring Part 2; Secure Beam Assemblies to Posts

Yardistry YM12810X
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 support@yardistrystructures.com
D: Make sure each corner is square and level then attach Beam Assemblies to Post Assemblies with two 5/16
x 4-3/4” Lag Screws (with 1/4-5/16” large washer) per corner. (g. 4.4)
E: Depending on what you are placing the Pergola Room on will determine how you anchor it to that surface.
Please refer to pages 6 and 7 for installation examples.
Any hardware or extra materials for
mounting will have to be purchased in advance.
Hardware
8 x 5/16 x 4-3/4” Lag Screw (1/4-5/16” large washer)
1/4-5/16”
Large
Washer
5/16 x 4-3/4”
Lag Screw
5/16 x 4-3/4”
Lag Screw
Fig. 4.4
Beam
Assembly
Beam
Assembly
Post Assembly
Step 4: Frame Assembly and Anchoring
Part 2
1/4-5/16”
Large
Washer

Related product manuals