EasyManua.ls Logo

Yardline BRAXTON - Page 78

Yardline BRAXTON
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
76
PARTS REQUIRED:

2" (5,1 cm)
You have nished installing your over door and gable trim.
Install two HAB over door trim using 2" nish nails level and ush to top door hinge board .
Install left and right gable trim ERL and ERR using 2" nish nails level and ush to gable overhang trim
.
Repeat STEP 2 to install ERL and ERR to opposite side of shed.
3
BEGIN
1
FINISH
GABLE & DOUBLE DOOR FRONT TRIM
19/32" x 3-1/2" x 53" (5,1 x 10,2 x 134,6 cm)

HAB
19/32" x 3-1/2" x 69-15/16" (5,1 x 8,9 x 177,6 cm)

ERR

ERL
19/32" x 3-1/2" x 69-15/16" (5,1 x 8,9 x 177,6 cm)


ERL
ERR
HABHAB

Finish Nails

Finish Nails
LEVEL
LEVEL
CENTER
CENTER
Flush
8"
(20,3 cm)
Approximately
8"
(20,3 cm)
Approximately
Flush
Flush
Flush
Flush

Related product manuals