YASKAWA ELECTRIC TOBP C730600 49A V1000 Option MECHATROLINK-II Installation Manual 11
3 Receiving
3 Receiving
Please perform the following tasks after receiving the MECHATROLINK-II Option:
• Inspect the MECHATROLINK-II Option for damage.
If the MECHATROLINK-II Option appears damaged upon receipt, contact the shipper
immediately.
• Verify receipt of the correct model by checking the information on the nameplate (see
Figure 1).
• If you have received the wrong model or the MECHATROLINK-II Option does not
function properly, contact your supplier.
◆ Contents and Packaging
Table 2 Contents of Package
◆ Tool Requirements
A Phillips screwdriver (#2, #3 <1>) U.S. standard size is required to install the
MECHATROLINK-II Option.
Description: Option Unit Ground Cables
Warning Label
Stickers
Installation Manual
_
Quantity: 1411
<1> Screw sizes vary by drive capacity. Select a screwdriver that matches the drive ground terminal (M3.5 to M6).