IM 5E1E70-01E
27
(4) In the case of other program pattern is set.
The starting point of program-driven operation is any of points A (SSP) to D.
PV
1
2
3
4
5
C
D
B
A(SSP)
Seg.1 Seg.2 Seg.4 Seg.5Seg.3
Time
PV
1
2
3
4
5
C
D
B
A(SSP)
Seg.1 Seg.2 Seg.4 Seg.5Seg.3
Time
The starting point of program-driven operation is determined by where the measured input value (PV) is
located at the time the operation starts.
Starting point of program-
driven operation
Measured input value (PV) at startup of
program-driven operation
D
D
C
B
A (SSP)
1
2
3
4
5