2.1 Installing Rack Mountable Devices
This chapter explains the procedure for installing the safety control unit, the safety node unit,
and the unit for the optical ESB bus repeater module, on a 19-inch rack.
SEE
ALSO
For more information about installation of ProSafe-RS hardware, refer to:
ProSafe-RS Installation Guidance (TI 32S01J10-01E)
n
Space for Heat Radiation
The suf
ficient spaces for heat radiation should be reserved.
When a safety control unit, a safety node unit, and a unit for optical bus repeater module
are installed on the same rack, they should be placed away from each other at least for 3
UNIT (1 UNIT=44.45mm).
If the repeaters and other devices are installed on the same rack, they should be placed
away from each other at least for 3 UNIT (1 UNIT=44.45mm).
SEE
ALSO
For more information about equipment installation environment, refer to:
ProSafe-RS Installation Guidance (TI 32S01J10-01E)
n
Maintenance Spaces
Be sure to allow spaces for maintenance.
All cables for units and I/O modules are connected to the front.
The indicator lamp checks, setting, inspection, removal, and insertion of each module or
unit are done from the front of the equipment.
Adequate space is required for suction and exhaust of the cooling fan of equipment.
Allow a space of at least 1000 mm in front of the equipment for wiring and maintenance.
Top panel
Front
Maintenance area
Min. 3 UNIT
Min. 50 mm
Min. 100 mm
Min. 1000 mm
Do not stack instruments without space.
Fan
Figure 2.1-1 Rack Mounting Space
<2.1 Installing Rack Mountable Devices> 2-2