CENTUM VP
Installation Guidance
TI 33J01J10-01EN
TI 33J01J10-01EN
©Copyright Mar. 2015 (YK)
12th Edition Mar. 2019 (YK)
Yokogawa Electric Corporation
2-9-32, Nakacho, Musashino-shi, Tokyo, 180-8750 Japan

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the YOKOGAWA Centum VP and is the answer not in the manual?

YOKOGAWA Centum VP Specifications

General IconGeneral
System TypeDistributed Control System (DCS)
ArchitectureClient-Server
Control NetworkVnet/IP
Controller TypeFCS (Field Control Station)
Programming LanguagesFunction Block Diagram (FBD), Sequential Function Chart (SFC), Ladder Diagram (LD), Structured Text (ST)
Operating SystemReal-time OS (for Controllers)
RedundancyController, Communication Network, Power Supply
I/O ModulesAnalog I/O, Digital I/O
Communication ProtocolsModbus, OPC, Foundation Fieldbus, Profibus, HART
ScalabilityFrom small to large applications
SecurityUser Authentication, Authorization, Audit Trail
Integration CapabilitiesOPC UA, Modbus, Ethernet/IP

Summary

System Installation Requirements

Control Room Design

Guidelines for control room layout, strength, illumination, and ventilation.

Control Room Environment

Environmental conditions for operation, including temperature, humidity, vibration, and air purity.

Power Supply System

Requirements for stable system operation, including voltage, frequency, waveform, and noise.

Grounding

Procedures for grounding devices to prevent electric shock and minimize noise.

Noise Countermeasures

Measures to prevent noise induction from various sources like electromagnetic fields and static electricity.

Countermeasures against Static Electricity

Procedures to prevent electrostatic damage when handling sensitive components.

Cabling Requirements

Rules for laying power and signal cables, including separation and distance.

Corrosive-gas Environment Compatibility

Product compatibility with corrosive gas environments and classification of gas levels.

Applied Standards

List of safety and EMC conformity standards the system complies with.

Standards for Hazardous Location Equipment

Standards for equipment used in hazardous locations.

Marine Standards

Compliance with marine standards like ABS, BV, LR, and DNV GL.

Installation Environment Specifications

Table of environmental requirements for installation, including temperature and humidity.

Transportation, Storage and Installation

Precautions for Transportation

Guidelines to prevent damage during equipment transport, including loading and handling.

Unpacking

Inspection procedures for received equipment to prevent damage and condensation.

Storage

Conditions and locations for storing products to maintain integrity.

Servicing Area

Guidelines for determining space around equipment for operation and maintenance.

Installation

Methods for installing equipment on various floor types and arranging cabinets.

Installing Cabinets in a Side-by-Side Arrangement

Procedures for installing multiple cabinets together, including leveling and interconnection.

19-inch Rack Mount Devices

Instructions for mounting devices in a 19-inch rack, including spacing and heat radiation.

DIN Rail Mountable Devices

Guidelines for mounting devices to a DIN rail, including space and orientation.

Wall Mountable Devices

Procedures for mounting devices to a wall, including space for heat dissipation and servicing.

Cabling

Cables and Terminals

Recommendations for flexible cables and proper terminal connections for system equipment.

Power Cables

Specifications for conductor cross-sectional area and examples of suitable power cables.

Grounding Cables

Specifications for conductor cross-sectional area and examples of suitable grounding cables.

Connecting Power

Procedures for power cable termination using solderless lugs and sleeve terminals.

Connecting Signal Cables

Guidelines for connecting signal cables to I/O modules, including process I/O and specific module types.

Installation Specifications

Electrical Specifications

Power consumption, voltage, frequency, and heating values for CENTUM VP components.

Actual Power-On In-Rush Current of Each Component

Data on measured in-rush current for components during power-on, including measurement conditions.

Maximum Power Consumption of FIO

Table detailing maximum current consumption for FIO modules across different voltage inputs.

Maximum Power Consumption of N-IO

Table detailing maximum current consumption for N-IO modules across different voltage inputs.

Breaker Specifications

Recommended breaker ratings for built-in and external protection for system components.

Parts Durability

Recommended replacement intervals for parts with defined life spans, considering operating environment.

Post-installation Inspection and Environmental Preservation

Post-installation Inspection

Items to inspect after installation before powering on, focusing on environmental factors.

Post-installation Environment Preservation

Precautions to maintain the proper operating environment after installation, including HVAC and humidity control.