EasyManua.ls Logo

York RecipPak YEAZ88DR6 - Page 49

York RecipPak YEAZ88DR6
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FORM 150.60-NM4
YORK INTERNATIONAL 49
FIG. 15 5 STEP LOADING/UNLOADING (RETURN WATER CONTROL)
FIG. 16 7 STEP LOADING/UNLOADING (RETURN WATER CONTROL)
LD02091
LD02090
NOTE:
The micro controls loading and unloading
on a 10 STEP scale regardless of the num-
ber of stages present. Therefore, loading
and unloading responses on 5 Step (stan-
dard) chillers may appear delayed (time
between stages increased) when miss-
ing steps are activated or deactivated by
the micro.
NOTES:
1. The Lead Comp + 2 Steps, Lag Comp
Off Step is skipped on a temperature
drop.
2. The micro controls loading and unload-
ing on a 10 STEP scale regardless of
the number of stages present. There-
fore, loading and unloading responses
on 7 Step (optional) chillers may ap-
pear delayed (time between stages in-
creased) when missing steps are acti-
vated or deactivated by the micro.
7 STEP (OPTIONAL, See page 68)
5 STEP (STANDARD, See page 68)

Related product manuals