15
YORK INTERNATIONAL
FORM 102.20-FA1 (1104)
FIG. 23 - UNIT BASE ON EDGE
c) At this point the unassembled portion of some
units can be stood on edge and moved through
the entranceway.
Further breakdown may be neces-
sary on larger units. Perform steps
21 through 23 as necessary.
21. SEPARATE UNIT BASE AT SHIPPING SPLITS
a) Remove bolts and nuts at lifting lug.
FIG. 24 - REMOVE HARDWARE AT LIFTING LUG
b) Separate base at shipping splits.
FIG. 25 - SEPARATE BASE
22. REMOVE OPTIONAL BASE RAILS
FIG. 26 - REMOVE BASE RAILS
c) With unit base turned on edge remove screws
from bottom of unit where the base rails attach
to the bottom of the base raceways and/or fl oor
panels.
d) Remove base rails.
23. REMOVE THE BOTTOM FLOOR PANELS AS
NECESSARY TO FIT THROUGH ENTRANCE
a) Remove seam caps from fl oor where panels are
joined together.
b) Remove screws from the base raceway where it
attaches to the top of fl oor panels. (Unit interior
side of unit base.)
c) Flip unit bottom up.
d) Remove screws from bottom of fl oor panel(s)
into raceways.
e) Remove fl oor panel(s).