EasyManua.ls Logo

York Solution - Disassembly - Coil Bulkhead and Raceways; Remove Coil Bulkhead and Bottom Raceways

York Solution
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
YORK INTERNATIONAL
14
FORM 102.20-FA1 (1104)
b) Slide coil onto forklift or cribbing.
c) Carefully guide coil away from bulkheads and
raceways.
d) Set coil on four” x four” blocking.
FIG. 19 - MOVING COIL
FIG. 20 - BLOCK COIL
19 – REMOVE COIL BULKHEAD
FIG. 21 - REMOVE COIL BULKHEAD
Do not remove drain pan unless
necessary to t through entranceway.
A positive water/air seal is extremely
dif cult in the eld.
20. REMOVE BOTTOM TIER RACEWAYS
a) Remove 3/16" hex allen head screws from bot-
tom of vertical raceways.
FIG. 22 - REMOVE 3/16" HEX ALLEN SCREWS
b) Separate raceway assembly from base and set
aside.

Related product manuals