STARTUP AND OPERATOR TRAINING
The services of a factory trained, field service representative will be provided to supervise 
the final leak testing, charging and the initial startup and conduct concurrent operator 
instruction.
FACTORY INSULATION
Factory-applied, anti-sweat insulation shall be attached to the cooler shell, flow chamber, 
tube sheets, suction connection, and (as necessary) to the auxiliary tubing. The insulation 
shall be a flexible, closed-cell plastic type, ¾ inch thick, applied with pressure-sensitive 
adhesive and vapor-proof cement. The insulation will normally prevent sweating in envi-
ronments with relative humidity up to 75% and dry bulb temperatures ranging from 50 to 
90 °F.
ISOLATION MOUNTING
Included with the unit are four vibration isolation mounts, consisting of 1" thick neoprene 
isolation pads, for field mounting. The pads are to be mounted under the steel mounting 
pads on the tube sheets. The unit is suitable for ground floor installation.
SHIPMENT FORM #1
The unit shall be completely assembled, with all main, auxiliary, and control piping in-
stalled, controls wired, leak tests completed, air run tests completed, and refrigerant 
charge in place. Other miscellaneous materials shall be packed separately.
Guide Specifications (Cont'd)