EasyManua.ls Logo

Zendure AB2000 - Mounting Your AB2000

Zendure AB2000
83 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
EN
Keep the AB2000 on a level surface, at against the
wall.
Choose a location without direct sunlight.
To ensure a better user experience of the mobile
app, place the Smart PVHub and AB2000 in an area
with good WiFi coverage.
Remove the plastic protective covers on the connection port, then please align
the left side rst.
Carefully align the AB2000 Battery Ports and slowly put it into place. Vertically
stacked AB2000 Batteries do not need a Battery Cable to establish a
connection.
6.1 Choosing an Appropriate Location
6.2 Connecting Your AB2000
6. Getting Started
AB2000 should be turned off before connection.
Do not connect the batteries while they are being charged or discharged.
Do not touch the metal pins of the ports with your hands or other objects.
Gently clean them with a dry cloth when necessary.
The Battery Mounting Brackets can be used to secure the AB2000 units in
place.
Tips:
!
If local regulations or your personal discretion call for securing AB2000 to
a wall, the included mounting hardware can be used. It is recommended to
secure your AB2000 in place with the included hardware, especially if you
have multiple batteries stacked on top of each other.
6.3 Mounting Your AB2000
1
2
3
4
5
6
Screw bolt into the hole on parts & .
After inserting, adjusting the distance from the wall between AB2000 via
as needed.
Put the notch on the handle of AB2000 to mount the AB2000 in place.
1 2
4
5
3

Table of Contents

Related product manuals