EasyManuals Logo

Zephyr AK6000 User Manual

Zephyr AK6000
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
INSTALLATION
11
STEP 7
STEP 9 (also refer notes on pg. 16)
STEP 11
STEP 8
STEP 10
STEP 12 (also refer notes pg. 16)
1. Lift hood to bottom of cabinet 1. Support hood to place, fasten both rear with screws
and washers provided.
1. Fasten front of hood. Level all sides and adjust
accordingly.**
1. Drill out cabinet base through electrical box with
3/4" boring bit.
1. Pull electrical supply wire through drill out or use
#14 grounded wire for receptacles (not supplied)
1. Connect both wires (blk) on hood to either power
supply (blk or wht). Ground green wire.**

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr AK6000 and is the answer not in the manual?

Zephyr AK6000 Specifications

General IconGeneral
BrandZephyr
ModelAK6000
CategoryVentilation Hood
LanguageEnglish

Related product manuals