EasyManua.ls Logo

Zephyr AK6000

Zephyr AK6000
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
11
STEP 7
STEP 9 (also refer notes on pg. 16)
STEP 11
STEP 8
STEP 10
STEP 12 (also refer notes pg. 16)
1. Lift hood to bottom of cabinet 1. Support hood to place, fasten both rear with screws
and washers provided.
1. Fasten front of hood. Level all sides and adjust
accordingly.**
1. Drill out cabinet base through electrical box with
3/4" boring bit.
1. Pull electrical supply wire through drill out or use
#14 grounded wire for receptacles (not supplied)
1. Connect both wires (blk) on hood to either power
supply (blk or wht). Ground green wire.**

Related product manuals