EasyManua.ls Logo

Zerova DB Series - Static EVSE Checks; Power-On EVSE Checks; Charging Process Checks

Zerova DB Series
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
3.6.3
EVSE Check – Static (Non-Powered)
Item
Status
Remark
Outlook
No dent,rust ,scratch
Labeling & Warning signs
Package (accessory) list
Inner wiring & connection
Refer 3.5.2 Screw torque table
Robustness of input wirings
WARNING:
Improper connection of the EVSE grounding conductor can
result in a risk of electric shock. Please ensure the EVSE is properly
grounded prior to energize it.
3.6.4
EVSE Check - Power On
Item
Status
Remark
Screen On (within 3 mins)
Acoustic noise
Screen display & function
Network connection quality
Cooling Fans operation & noise
Remote control & monitoring
3.6.5
EVSE Check – Charging
Item
Status
Remark
Waiting time of Connection Check
Reading of each display item
Full charge test
Function of electronic lock
Airflow & noise of cooling Fan