EasyManua.ls Logo

Zip Hydroboil HS003 User Manual

Zip Hydroboil HS003
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 1 of 12
Installation and Operating Instructions
Zip Hydroboil
Instant boiling water
HS001 Zip Hydroboil 1.5 Litre White 01552
HS003 Zip Hydroboil 3.0 Litre White 03552
HS005 Zip Hydroboil 5.0 Litre White 05552
HS105 Zip Hydroboil 5.0 Litre Stainless Steel 05551
HS007 Zip Hydroboil 7.5 Litre White 07552
HS107 Zip Hydroboil 7.5 Litre Stainless Steel 07551
®
Question and Answer IconNeed help?

Do you have a question about the Zip Hydroboil HS003 and is the answer not in the manual?

Zip Hydroboil HS003 Specifications

General IconGeneral
BrandZip
ModelHydroboil HS003
CategoryBoiler
LanguageEnglish

Summary

Product Description

Installation Checklist

Before Installation

Checks and preparations required before starting the installation process.

Before Commissioning

Final checks on plumbing and electrical connections before powering up.

Commissioning Steps

Procedures for turning on the water supply and power.

Product Specifications

Safety Warnings and Precautions

General Safety

Essential safety guidelines for operating and handling the appliance.

Lifting Precautions

Guidelines for safely lifting and moving the appliance unit.

Operating Conditions

Recommended ambient temperature range and frost protection.

Cleaning Instructions

Proper methods for cleaning the appliance's exterior.

Installation Requirements

Clearance Requirements

Minimum clearances needed around the appliance for installation and service.

Electrical Supply

Specifications for the required electrical connection and protection.

Water Supply

Requirements for the cold water supply, including pressure and valves.

Drainage and Venting

Requirements for connecting the appliance's vent and drainage.

Installation Procedures

Step 1 - Positioning

Guidance on placing the heater correctly on the wall.

Step 2 - Fastening

Instructions for securely mounting the heater to the wall.

Step 3 - Connecting

Details on connecting water, vent, and electrical supplies.

Step 4 - Assembling

Procedure for assembling the casing and fitting the tap.

Step 5 - Commissioning

Final steps to prepare the unit for operation after installation.

Operating Procedures

Tap Operation

How to use the two-way tap for dispensing boiling water.

Earthing Continuity and Wiring

Template Dimensions

Diagram showing physical dimensions for mounting.

Earthing Continuity Test

Procedure for verifying earth continuity after installation or service.

Wiring Diagram

Schematic representation of the appliance's electrical connections.

Problem Solving

Maintenance and Cleaning

Spare Parts List

End of Life Disposal

Warranty Information

Registering Your Purchase

Instructions on how to register the appliance for warranty purposes.

Related product manuals