EasyManua.ls Logo

Zip Hydroboil HS005 User Manual

Zip Hydroboil HS005
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 1 of 12
Installation and Operating Instructions
Zip Hydroboil
Instant boiling water
HS001 Zip Hydroboil 1.5 Litre White 01552
HS003 Zip Hydroboil 3.0 Litre White 03552
HS005 Zip Hydroboil 5.0 Litre White 05552
HS105 Zip Hydroboil 5.0 Litre Stainless Steel 05551
HS007 Zip Hydroboil 7.5 Litre White 07552
HS107 Zip Hydroboil 7.5 Litre Stainless Steel 07551
®
Question and Answer IconNeed help?

Do you have a question about the Zip Hydroboil HS005 and is the answer not in the manual?

Zip Hydroboil HS005 Specifications

General IconGeneral
ModelHS005
TypeInstantaneous Water Boiler
Capacity5 Litres
MaterialStainless Steel
Voltage230V
Installation TypeWall-mounted
Safety FeaturesBoil-dry protection

Summary

Product Specifications

Safety and Warning Information

Safety Precautions

General safety advice for users, including children and unsupervised use. Avoid touching hot tap.

Lifting Guidelines

Advice on safe lifting of the unit, considering weight limits and seeking assistance if needed.

Operating Conditions and Cleaning

Recommended ambient temperatures, frost protection measures, and cleaning methods for the unit.

Key Installation Requirements

Electrical Supply Requirements

Details on required electrical supply, fused spur, isolation switches, and RCD protection.

Water Supply and Pressure

Specifies potable cold water supply, minimum/maximum pressure, and the need for a pressure reducing valve.

Drainage and Venting Access

Requirements for outlet drainage to a sink or drip tray and safe access for the vent pipe.

Step-by-Step Installation Procedures

Heater Positioning

Guidance on heater placement, tap height above draining board, and clearance for service access.

Heater Fastening

Instructions for drilling holes, mounting the chassis, and securing the unit to the wall with suitable fixings.

Connecting Plumbing, Venting, and Electrical

Details the procedures for plumbing, venting, and electrical connections to the unit.

Assembling and Tap Fitting

Instructions for assembling the casing and fitting the tap assembly correctly, including PTFE tape use.

Unit Commissioning

Steps to follow after installation, including filling with water, checking leaks, and initial heating periods.

Operating the Hydroboil

Tap Operation Guide

How to operate the two-way tap for dispensing boiling water, including filling cups and larger vessels.

Earthing Continuity and Wiring Diagram

Troubleshooting Common Issues

Maintenance and Cleaning Guide

Spare Parts List

Product End of Life Disposal

Product Warranty Information

Related product manuals