EasyManua.ls Logo

Zip Hydroboil HS005 - Electrical Supply Requirements; Water Supply and Pressure; Drainage and Venting Access; Step-by-Step Installation Procedures

Zip Hydroboil HS005
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 6 of 12
Before You Begin
Locatethepapermounting-holetemplatepackedwiththeheater.
Readtheinstallationandoperatinginstructionscompletely.
Decidewhethertoinstallwithconcealedorexposedplumbingand/orelectrical
connections. Concealed connections are preferred for superior appearance.
Step 1 – Positioning
Positiontheheatersothetapwilldrainontoadrainingboardordriptray.
Positionthebaseofthetaptobenotlessthan200mmabovethedraining
board(heightshouldbeincreasedonlyifessentialforfillinglargervessels).
Provideclearanceforserviceaccessofnotlessthan150mmtop,65mmleft,
20mmright.
Markcornerpositionsfortheheateronthewallsoastopositionthepaper
mounting-holetemplate.
Step 2 – Fastening
Positionmounting-holetemplateonwallanddrillholeswhereshown.
Drillholesforwaterinlet,ventoutletandwiringifrearaccessisintended.
Removecoverfasteningscrews(asshownbelow)fromheaterandliftwhole
cover off heater.
Installplumbingandwiringandpreparepipeendsandwiringendsasshown.
Screwheaterchassistothewallusingthesuppliedfixings,ensurethefixings
aresuitableforthesubstrate.Ifnotsupplyyourownsuitablefixings.
Ensurethemountingsurfaceiscapableofsupportingtheweightofthefilled
unit,fixingsmustbecapableofsupportingtheheaterweightwhenfilled.See
Productspecificationsforfilledweights.
Installation Procedures
COLD
INLET
VENT
OUTLET
INLET
POSITION
VENT
POSITION
MinimumClearanceinmm
b. Electrical supply.
Astandard13ampdoublepolefusedspuronthewallwithin1500mmof
the heater.
Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.
The circuit should be protected by a suitably rated RCD.
TheelectricalinstallationshouldcomplywithcurrentIEEregulationsand
anyLocalAuthorityrequirements.
c. Apotablecoldwatersupplywithaminimumworkingpressureof0.07
MPa(0.7bar)andamaximumworkingpressureof0.7MPa(7bar)
connected via an isolation valve.
d. Outletdrainagetoasinkdrainingboardortoadriptray.
e. Accesstodrainagefromaventsituatedatthebaseoftheheater.
f. Ifthewaterpressureislikelytoexceed0.7MPa(7bar),a0.35MPa
(3.5bar)pressurereducingvalvemustbeinstalledinthecoldwater
supply line.
g. Inallinstallationinstancesthewallsoftheheatermustbeverticalandthe
basehorizontal,therecanbenoexceptionstothisrule.
Installation Requirements Continued
Size Kw Amps
1.5 Ltr 1.5kW 13 A
3.0 Ltr 2.4kW 13 A
5.0 Ltr 2.4kW 13 A
7.5 Ltr 2.4kW 13 A
Concealed
Services
Exposed
Services
Front View

Related product manuals