EasyManua.ls Logo

Zodiac MilPro ERB 310 - Warning; Notice; Putting the Boat into Use; Inventory Upon Opening

Zodiac MilPro ERB 310
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2/16
PUTTING THE BOAT INTO USE
To identify the boat, turn to the APPENDICES:
Technical specifications (page A-2, A-3),
Description (page A-4, A-5).
warning
WHEN ASSEMBLING THE BOAT, IT IS IMPORTANT THAT YOU
FOLLOW THE PROCEDURE IN THE CORRECT ORDER. REFER TO
THE PAGES INDICATED BELOW FOR STEP BY STEP INSTRUCTIONS.
Procedure for putting the boat into use and storage Page Section
1. Inventory upon opening
2 INVENTORY UPON OPENING
2. Activate the valves to inflation position
3 INFLATION VALVES
3. Slightly inflate the buoyancy tube
7 BOAT INFLATION
4. Inflate the buoyancy tube
7 BOAT INFLATION
5. Inflate the high pressure floor
7 BOAT INFLATION
6. Inflate the keel
7 BOAT INFLATION
7. Adjust the pressures
9 AIR PRESSURE
8. Store the boat
11 DEFLATION/FOLDING
warning
FOR DETAILS ON QUICK INFLATION, REFER TO PAGE - 8
INVENTORY UPON OPENING
warning
DO NOT USE SHARP IMPLEMENTS (CUTTER, KNIFE, ETC…)
The package of your boat contains 1 buoyancy tube as well as:
Description ERB 310
1. High pressure Floor 1
2. Repair kit 1
3. Owner manual (2 volumes) 1
4. Fast inflation kit for Scuba bottle 1
5. Cylinder sheath on floor 1
6. Repair kit (including pressure gauge). 1
7. Boat carrying valise 1
8. Respirator haversack 1
9. Telescopic paddles 2
10. Inflation pump (1 standard Heavy-duty inflation pump and 1 high-pressure
inflation pump)
2
NOTICE
If you wish to replace lifting rings (for davits) you must imperatively attach them to the
buoyancy tubes and transom (and not to the floor).

Related product manuals