EasyManua.ls Logo

Zte ZXHN H108L - Chapter 3 Installation Preparation; Hardware Description

Zte ZXHN H108L
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Chapter 3 Installation Preparation
3.1 Hardware Description
Front panel
Figure 3.1-1 Front Panel of the ZXHN H108L
Table 3.1-1 Descriptions of the LEDs on the Front Panel
Function Color Definition
Off Power off
Solid Green Power on
Power
Red
POST (Power On Self Test) failure
(not bootable) or Device malfunction
Slowly Flash
Green
DSL line handshaking in progress
Fast Flash
Green
DSL line training in progress
DSL
Solid Green DSL line connection is up.
Off
The system is under the Bridge mode
or the ADSL has not been connected.
Internet
Solid Green
The system is under the Route mode
and the ADSL has been connected.
The MODEM IP data packet can be
normally transferred (For example, the
built-in PPPOE has been established
and the dynamic IP address has been
obtained).

Other manuals for Zte ZXHN H108L

Related product manuals