EasyManua.ls Logo

3Com 4200G - Page 32

3Com 4200G
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32 CHAPTER 2: INSTALLING THE SWITCH
Figure 10 RPS Connection to the Switch
When the RPS is connected to the switch, you can move the circuit
breaker in the RPS to the closed (on) position and the switch will be
powered by the -48V DC power.
The -48V DC power takes priority over the AC mains and powers the
switch if it is connected.
Connecting the
Earthing Cable
Use the earthing cable that accompanies your switch if the length is
suitable. Alternatively use the earthing cable specification as defined in
Appendix C on page 127.
The earthing cable is only required if the switch is powered by the RPS
only.
The recommended cable length should not exceed three metres (9.84
feet).
+
-
NULL
-48 -60V;2.0A
100-240V;50/60Hz;1.0A
~
NULL
-48 -60V;2 0A
Null
+
-
Pinout
Cable Tie
10014914_AB_Switch 4200G.book Page 32 Tuesday, October 2, 2007 12:13 PM

Table of Contents

Other manuals for 3Com 4200G

Related product manuals