EasyManua.ls Logo

3Com Baseline 2226 Plus - Page 75

3Com Baseline 2226 Plus
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Solving LED Issues 75
If the connection is to a workstation, that
the workstation's network interface is
installed and configured correctly.
The correct category of cable is being used
for the required link speed. Category 3
cables can be used for 10BASE-T operation
only. Category 5 cable is required for
100BASE-TX or 1000BASE-T. 3Com recom
-
mends Category 5e or 6 cables for
1000BASE-T operation.
A fiber cable is connected, but the Module
Active LED is off.
Verify that:
The fiber cable is in good condition.
The SFP module is correctly inserted.
A 3Com SFP module is being used. Refer to
Approved SFP Transceivers” on page 19 for
details.
The equipment at the far end is installed and
correctly configured.
The Link/Activity LED is on, but network
performance is poor
The Switch supports full-duplex autonegotia-
tion. If the connected device does not support
autonegotiation, ensure that it is configured for
half-duplex operation only. If the connected
device has autonegotiation disabled or overrid
-
den, and is configured as full-duplex, the
Switch will configure the link as half-duplex,
causing a mismatch that will reduce network
performance when data is transmitting and
receiving simultaneously on the same link.
Ensure that the connected device has either:
Autonegotiation enabled, or
The ports are configured for half-duplex
operation

Table of Contents

Other manuals for 3Com Baseline 2226 Plus

Related product manuals