EasyManua.ls Logo

3Com SuperStack II - Page 69

3Com SuperStack II
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a New Module (Model 5xx) 69
4 Reinstall the screw on the standoff.
5 Reinstall the cover and the cover screws.
CAUTION: The DIP switches should all be in the down position. The
DIP switches are accessible through an opening on the side of the
chassis.
6 If the bridge/router was mounted with brackets, reinstall the brackets
and remount it.
7 Reconnect the power cord and all cables.
DIP switches should all
be in the down position
Install screws
HWBook Page 69 Friday, June 19, 1998 3:42 PM

Table of Contents

Other manuals for 3Com SuperStack II

Related product manuals