Preventive Maintenance
©
3M 2006
7
During Operation
Always use the bench stand provided when 3M™
Scotch-Weld™ Hot Melt Applicator PG II is not in
use. Do not lay the applicator on its side. This
impedes cooling process and may cause plugging
problems.
Open adhesive stick container only when necessary.
Keep sticks clean and free from airborne
contaminants.
After Operation
Before shutting down the 3M Scotch-Weld Hot Melt
Applicator PG II put the electrical switch in the “off”
position. Continue using the applicator until
approximately one adhesive stick has been
discharged. If 3M Scotch-Weld Hot Melt Applicator
PG II has not been in use but still on heat prior to
shut down
without extruding adhesive, allow at
least one hour for heat-up.
Lubricate inside loading cartridge with 3M™
Silicone Lubricant or equivalent once a week.