EasyManua.ls Logo

ABB A155-M Series - Fig. 91: Installing the Cartridge Group 1; Installing the Cartridge Group

ABB A155-M Series
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
10 Dismantling and fitting, cartridge concept / 10.8 Installing the cart-
ridge group
© Copyright 2020 ABB. All rights reserved. HZTL4032_EN Rev.P March 2020
10.8 Installing the cartridge group
Fig.91: Installing the cartridge group 1
1. Attach lifting gear to bearing casing.
2. Remove fixing screws.
3. Lift the cartridge group out of the service support (90012).
4. Fit new O-rings(42195, 42200).
5. Screw the clamping nut (42201) flush onto the threaded rod (42191). The hexagon of the
thread screw is at the top.
Place the washer (01) of the clamping nut onto the expansion bush and, with the clamp-
ing nut screwed on, guide the threaded rod through the washer, expansion bush and
bearing casing.
6. Screw the centering bush (42193) flush onto the threaded rod from below.
7. Lift the centering bush (42193) using the threaded rod (42191) and hold it firmly.
8. Rotate the clamping nut (42201) downwards until the stop is reached.
Page 125 / 171

Table of Contents

Other manuals for ABB A155-M Series

Related product manuals