EasyManua.ls Logo

ABB A155-M Series - Fig. 118: Pipe Assembly; Fig. 119: Elbow 1 Assembly

ABB A155-M Series
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
12 Removing and installing 6-nozzle turbine cleaning component (op-
tional) / 12.2 Assembly
© Copyright 2020 ABB. All rights reserved. HZTL4032_EN Rev.P March 2020
Fig.118: Pipe assembly
1. Coat thread and contact surfaces of cutting ring with high-temperature grease.
2. Position pipe (51312).
3. Position union nuts (51316) of pipe on connecting piece (51313) and screw-in fitting
(51305) and tighten by hand only.
Fig.119: Elbow 1 assembly
u Coat thread and contact surfaces of cutting ring with high-temperature grease.
u Screw union nuts(51316) of elbows (51311) in the specified order (01, 02, 03, 04, 05) to the
connecting pieces (51313).
Page 147 / 171

Table of Contents

Other manuals for ABB A155-M Series

Related product manuals