ACS150, ACS310, ACS320, ACS350 and ACS355
MUL1-R1 Installation instructions
WARNING! Before installing MUL1-R1
option, read the safety instructions and
mechanical and electrical installation
instructions in the drive user’s manual.
Follow the instructions when installing,
operating and servicing the drive. If
ignored, physical injury or death may
follow, or damage may occur to the
drive motor or driven equipment
1
,
.
Note: You cannot lead the Safe torque off (STO) cable
through the gland plate in the ACS355.
2. Fasten the gland box frame to wall with four M4 screws
(not included).
1. Fasten the gland box frame to drive with two M4×12
screws.
2
7
6
3b
5
4
3a
5, 6, 7. With any fieldbus option module except FRSA-00,
remove the support plate (5) install the I/O clamping plate
3. Install clamps (3a) for control cables (see power cable
lead-throughs), or if cables are run in conduits, replace all
clamps with suitable glands (not included). Run cables
through the clamps and tighten. Strip cable ends. Fasten
the grounding conductor (PE) of the input power cable and
© 2010 ABB Oy. All Rights Reserved. 3AFE68642868 Rev. E / 2010-01-25
4. With FPBA-01 or FCAN-01 option modules, remove the
detachable lid (4) from the gland box cover.
,
(6) and the option grounding plate (7) to the gland box
frame. See Mechanical installation in the drive manual.
the twisted shield of motor cable under the grounding
clamps (3b). Connect the conductors to appropriate
terminals. See Electrical installation in the drive manual.
This datasheet has been downloaded from http://www.digchip.com at this page