EasyManua.ls Logo

ABB CalMaster2 - Page 23

ABB CalMaster2
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Field and Software Tools
CalMaster2 and CheckMaster 4 Testing
IM/VCM2 Issue 6 21
8. Select 'Yes' or 'No'. A prompt appears to test the pulse outputs:
9. Select 'Yes' or 'No'. A series of self-calibration screens appear. These ensure that the
CalMaster2's reference calibration, battery and data integrity are acceptable. The
Connection complete screen appears:
10. Select 'Ok'. CalMaster2 starts the AutoTest sequence:
For each test there are three possible results:
Test Passed:
No action is necessary.
Test Failed:
Tes t Margi n a l:
Note. The first time CalMaster2 tests a flow meter that does not have an associated
fingerprint file, it must find a valid test that can be used as a reference. A screen appears
stating that CalMaster2 is searching for a reference test.
Note. This screen appears for 10 seconds before proceeding automatically to
the next test.
1. Select 'Retry'.
2. If the test fails again, either press 'Retry' to test again or 'Ok' to continue
to the next test.
Note. This screen appears for 10 seconds before proceeding automatically to
the next test.
1. Select 'Retry'.
2. If the test fails again, either press 'Retry' to test again or 'Ok' to continue
to the next test.
Connection
Check pulse outputs
Yes
No
Connection
Connection complete
Ok
AutoTest
Electrode1 impedance
Fail (0.358)
Ok
Retry
AutoTest
I.out span
Marginal (2.006)
Ok
Retry