14 | 2105515-001 rev. AB
4 Considerations outside the scope of this document
4.1 µFLOG5 startup
Now that the upgrade kit replacement parts are properly installed, the flow computer
must be connected to the manifold and meter run. The µFLO
G5
startup guide,
included with this kit, addresses startup from installation through setup and
operation. For the purposes of this upgrade kit, review the entire guide and then
begin with the first applicable section for this installation.
DANGER – Serious damage to health/risk to life. Manifold and tubing
connection leaks could create a build-up of explosive gases in the
immediate vicinity. Power should not be applied before the tubing and
connections are leak-free, the area is ventilated, and explosive gases
have dissipated.
IMPORTANT NOTES: RS-485 bus terminations are software
selectable in the G5 platform. During communication setup for COMM
1, the termination must be handled through the setup screen.