EasyManuals Logo

ABB HT610930 Instruction Manual

ABB HT610930
202 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #155 background imageLoading...
Page #155 background image
Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
10 Dismantling and fitting, cartridge concept / 10.8 Installing the cart-
ridge group
© Copyright 2020 ABB. All rights reserved. HZTL4032_EN Rev.P March 2020
10.8 Installing the cartridge group
Fig.91: Installing the cartridge group 1
1. Attach lifting gear to bearing casing.
2. Remove fixing screws.
3. Lift the cartridge group out of the service support (90012).
4. Fit new O-rings(42195, 42200).
5. Screw the clamping nut (42201) flush onto the threaded rod (42191). The hexagon of the
thread screw is at the top.
Place the washer (01) of the clamping nut onto the expansion bush and, with the clamp-
ing nut screwed on, guide the threaded rod through the washer, expansion bush and
bearing casing.
6. Screw the centering bush (42193) flush onto the threaded rod from below.
7. Lift the centering bush (42193) using the threaded rod (42191) and hold it firmly.
8. Rotate the clamping nut (42201) downwards until the stop is reached.
Page 125 / 171

Table of Contents

Other manuals for ABB HT610930

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HT610930 and is the answer not in the manual?

ABB HT610930 Specifications

General IconGeneral
BrandABB
ModelHT610930
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals